Site conditions will determine the procedure of installing the unit. A partial concrete base is required
for a dry site, whereas a complete concrete backfill may be required for a wet site and also where the unit
may be subject to super imposed loads. Lifting hooks are supplied with the Tri-cel septic tank to assist in
lifting the unit into position. Care must be taken to avoid any damage to external flanges or pipe work when
lowering the unit into the trench It is important to ensure that the unit is fully supported and completely
level when installed and the lip of the lid should sit flush with finished ground level. Connect to pipe work.
The unit is plumbed for 110mm uPVC pipe.
For a detailed method of installation, plumbing and wiring of the unit, please refer to our handbook.